Zero-CAPEX Industrial Power Wheeling

Buy Clean Solar Power Directly, Cut Heavy Industrial Tariffs by 30%–50%

Off-site solar power wheeling and long-term Power Purchase Agreements (PPA) for High-Tension (HT) commercial and industrial consumers in Tamil Nadu & South India. Zero upfront capital expenditure with 100% regulatory compliance.

30%–50%
HT Electricity Tariff Reduction
₹0 CAPEX
Zero Capital Investment Model
10–25 Yrs
Long-Term Tariff Price Lock
100 kW+
Green Energy Open Access Ready
Framework & Mechanics

Demystifying Solar Open Access & Power Purchase Agreements

If your facility has high electricity consumption but limited or unviable roof space, off-site Open Access solar power wheeling lets you purchase clean solar energy generated at a utility park directly through the grid.

policy
Grid Delivery Mechanism

The Open Access Framework

Open Access is the regulatory framework (Electricity Act 2003 & Green Energy Open Access Rules) enabling HT consumers to procure electricity directly from independent renewable power producers using the state transmission (TANTRANSCO) and distribution (TANGEDCO) grid networks.

  • check_circle Draw green solar power without any rooftop constraints or civil modifications
  • check_circle Lowered threshold to 100 kW under Green Energy Open Access (GEOA)
  • check_circle Direct grid credit adjustment against monthly DISCOM HT consumption bills
Off-Site Generation • Transmission Wheeling arrow_forward
handshake
Commercial Contracting Model

Power Purchase Agreement (PPA)

A Power Purchase Agreement (PPA) is a bilateral, legally binding contract between the power consumer (you) and the power developer (SolarQube / IPP) establishing a fixed, discounted unit tariff (₹/kWh) for solar power supplied over an agreed term of 10 to 25 years.

  • check_circle Zero Capital Expenditure: The solar developer finances, builds, and operates the plant
  • check_circle Inflation-Proof Energy Rates: Protect your operations against frequent DISCOM tariff hikes
  • check_circle Pay-As-You-Consume: Pay strictly for the actual clean units generated and wheeled
Zero Capex • Fixed Long-Term Tariff arrow_forward
Procurement Structures

Choose the Optimal Open Access Solar Model

Depending on your energy volume, legal structure, and equity preference, SolarQube structures tailored off-site and on-site procurement contracts.

Max Tariff Savings
hub

Group Captive Model

26% Equity • 51% Consumption Rule

The power buyer holds a minimum 26% equity stake in the Special Purpose Vehicle (SPV) power plant and consumes 51% of generated power. Crucial Benefit: 100% exemption from Cross-Subsidy Surcharge (CSS) and Additional Surcharge (AS).

Cross-Subsidy Surcharge (CSS): EXEMPT (₹0.00)
Additional Surcharge (AS): EXEMPT (₹0.00)
Upfront Equity: Nominal (~5%-10% of plant cost)
Typical Savings: ₹3.50 – ₹4.80 / unit
electric_meter

Third-Party Open Access

Zero Equity • 100% Bilateral PPA

Pure zero-equity power purchase contract between the industrial consumer and an off-site solar IPP developer. The buyer pays for delivered power plus applicable DISCOM wheeling and cross-subsidy surcharges.

Cross-Subsidy Surcharge (CSS): Applicable as per TNERC
Additional Surcharge (AS): Applicable
Upfront Equity: ZERO (₹0.00)
Typical Savings: ₹1.80 – ₹2.80 / unit
roofing

On-Site RESCO / OPEX

Rooftop Solar • Investor Funded

SolarQube installs and maintains the solar system directly on your factory or warehouse roof with zero CAPEX investment from your business. You purchase the generated power at a heavily discounted per-unit rate.

Transmission Losses: 0% (Generated On-Site)
Wheeling / CSS Charges: None (Exempt)
Maintenance / AMC: 100% Handled by Developer
Typical Savings: ₹3.00 – ₹4.20 / unit
Direct Tariff Comparison

Real Impact on Your Monthly HT Electricity Bill

Industrial electricity tariffs from state DISCOMs (TANGEDCO HT Tariff IA / IIA) average ₹8.50 to ₹10.50 per unit including peak TOD charges and electricity tax. By wheeling solar power via Group Captive Open Access, your landing cost drops to ~₹4.80 to ₹5.50 per unit.

Standard HT Grid Tariff: ₹9.00 – ₹10.50 / kWh
SolarQube Group Captive Landing: ₹4.80 – ₹5.40 / kWh
Net Savings Per Unit Wheeled: ₹3.80 – ₹4.50 / kWh
* Based on typical 1 MW wheeling capacity generating ~1.5 million units annually, resulting in ₹55,00,000+ in direct annual power expense savings.

Unit Cost Comparison (₹ / kWh)

₹9.50
Grid HT Tariff
DISCOM Grid
₹6.80
Third-Party PPA
Third-Party
₹5.10
Group Captive
Group Captive
CSS Exempt: Saves ~₹2.00/unit
10-25 Yr Inflation Shield
Complete Regulatory Management

You Run Your Operations.
We Handle DISCOM, SLDC & CEIG.

Power wheeling in India requires navigating state regulatory commissions, State Load Despatch Centres (SLDC), and distribution utility approvals. SolarQube provides comprehensive liaisoning and regulatory compliance.

verified GEOA Portal Filing: Single-window Green Open Access approvals within 15 days
verified CEIG Safety Clearances: Electrical Inspectorate testing, bay approvals & synchronizations
verified SLDC Scheduling & Telemetry: Real-time AMR metering & daily generation scheduling
verified Billing Reconciliation: Monthly TANGEDCO credit adjustments and banking audits
Tamil Nadu Electricity Regulatory Commission (TNERC) Compliant gavel
checklist

Eligibility Requirements

Are you qualified to procure Open Access solar?

  • electric_meter
    Sanctioned Load >= 100 kW:

    Eligible under the Green Energy Open Access (GEOA) Rules 2022 (lowered from previous 1 MW threshold).

  • power
    HT Connection (11 kV / 22 kV / 33 kV):

    High-Tension industrial/commercial consumer with dedicated transformer and TOD metering.

  • calendar_month
    Daytime Operational Load Profile:

    Continuous manufacturing, spinning, weaving, refrigeration, or corporate HVAC during 06:00 to 18:00.

Run Instant Eligibility Assessment arrow_forward
Complete Execution

5-Step Solar PPA Wheeling Lifecycle

From initial HT tariff audit to first wheeled kilowatt-hour, SolarQube manages every engineering, legal, and operational milestone.

01

Load & Tariff Audit

Analysis of last 12 months' DISCOM electricity bills, hourly load curve, and contract demand to compute optimal solar allocation.

Duration: 2–3 Days
02

PPA Term Sheet

Finalizing mutually agreed unit tariff, contract tenure (10-25 yrs), minimum guaranteed generation, and SPV share agreement.

Duration: 1 Week
03

Grid Wheeling Clearance

Filing open access application on National/State GEOA portal, feeder availability study, and DISCOM NOC grant.

Duration: 15–30 Days
04

CEIG & Metering

Installation of 0.2s class ABT/TOD special energy meters, RTU communication setup, and CEIG statutory inspection.

Duration: 1–2 Weeks
05

Power Wheeling & Billing

Commercial power flow commences. Solar units credited directly on your monthly electricity bill with monthly settlement statements.

Immediate Savings Active
Sector Suitability

Industries Benefiting from Open Access Solar

Power-intensive industrial consumers across Tamil Nadu, including Chennai, maximizing bottom-line profits with solar power wheeling.

precision_manufacturing

Textiles & Spinning Mills

Continuous 24/7 spinning, weaving, and sizing mills with high contract demands. Off-site solar wheeling stabilizes input yarn production costs against fluctuating energy tariffs.

Typical Load: 500 kVA – 5 MVA
factory

Foundries & Engineering

Induction furnace, casting, forging, and machining units where electricity constitutes up to 25% of total production cost.

Typical Load: 1 MVA – 10 MVA
ac_unit

Cold Storage & Food Processing

Continuous cooling and refrigeration compressor loads where daytime solar generation synchronizes directly with peak thermal cooling requirements.

Typical Load: 250 kVA – 2 MVA
local_hospital

Hospitals & Healthcare Chains

Multi-specialty facilities needing 100% reliable power without placing thousands of panels on critical hospital roofs.

Typical Load: 300 kVA – 3 MVA
corporate_fare

IT Parks & Corporate Campuses

High-density office towers meeting RE100 and ESG sustainability mandates with zero roof alterations and maximum green energy compliance.

Typical Load: 500 kVA – 5 MVA
science

Chemical, Plastic & Paper

Extrusion, molding, pulping, and chemical processing facilities with heavy daytime motorized power loads.

Typical Load: 1 MVA – 8 MVA
Frequently Asked Questions

Open Access Solar & PPA FAQs

Key questions regarding regulatory approvals, banking, billing adjustments, and Group Captive rules.

Free Industrial Energy Assessment

Powering Industrial Independence in Tamil Nadu.

Submit your HT contract demand details and our energy engineering team will prepare a custom financial model comparing your current TANGEDCO power costs against a Zero-CAPEX Group Captive PPA structure.

check_circle 100% Free HT bill audit & savings feasibility report
check_circle Liaisoning support across Tamil Nadu, including Chennai & all TN DISCOM circles
check_circle Direct access to operational MW solar power parks

Request Free PPA Feasibility Report

Receive your customized per-unit savings projection within 24 business hours.