Resources

Solar Guides & Updates

Practical guides on subsidies, net metering, and solar costs for homes and businesses across Tamil Nadu — written by our engineering team.

Subsidy

PM Surya Ghar subsidy: how much you actually get, and how to claim it

Subsidy slabs by system size, eligibility, the national portal process, and how long the money takes to reach your bank account.

Subsidy

Tamil Nadu's new ₹22,000 top-up: up to ₹1 lakh combined subsidy

The new 2026 state incentive on top of PM Surya Ghar, how much you can receive combined, and the simple two-step process to claim it.

Net Metering

How TANGEDCO net metering works in Tamil Nadu

What a bi-directional meter does, how export credits are adjusted on your bill, and the approval steps from application to commissioning.

Commercial

Solar for factories and mills: what the numbers look like

Accelerated depreciation, payback maths for HT consumers, and choosing between CAPEX, OPEX, and open access.

Cost

Solar panel cost in Salem: what actually decides your price

Wondering about solar panel price in Salem? Learn what decides rooftop solar cost, how to compare quotes fairly, and how to get an accurate written quotation.

Subsidy

PM Surya Ghar subsidy: the step-by-step application process

A clear step-by-step guide to applying for the PM Surya Ghar Muft Bijli Yojana rooftop solar subsidy in Tamil Nadu, from registration to subsidy credit.

Commercial

Solar for textile mills in Tamil Nadu: how it cuts your power bill

How solar works for textile mills, powerlooms and processing units in Tamil Nadu: daytime load matching, roof checks, funding models and accelerated depreciation.

Open Access

Open access and group captive solar in Tamil Nadu, explained

What open access solar and group captive solar PPAs are, who can use them in Tamil Nadu, the 26% and 51% captive rule, and how HT consumers can cut power costs.

Net Metering

Solar net metering with TANGEDCO: a simple guide

How solar net metering works with TANGEDCO in Tamil Nadu: the bi-directional meter, how export credits reduce your bill, and the approval steps for homes and businesses.

Maintenance

Solar AMC in Tamil Nadu: why maintenance protects your savings

What a solar AMC (annual maintenance contract) covers in Tamil Nadu: panel cleaning, inverter checks, monitoring and performance reports that protect your solar output.

Battery Storage

Battery storage (BESS) in Tamil Nadu: when it makes sense for your business

A practical guide to battery energy storage systems (BESS) in Tamil Nadu: backup power, peak demand management, solar self-consumption and what to check before buying.

Subsidy

PM Surya Ghar subsidy: how much you actually get, and how to claim it

PM Surya Ghar: Muft Bijli Yojana is the central government scheme that pays a fixed subsidy directly into your bank account when you install rooftop solar on a home. Here is what it covers and what the process actually looks like.

How much you get

The subsidy is tied to system size, not to what you spend. It is capped once you cross 3 kW, so a 5 kW system receives the same subsidy amount as a 3 kW one.

1 kW system ₹30,000
2 kW system ₹60,000
3 kW and above ₹78,000 (maximum)

For most households across Tamil Nadu, a 3 kW system is the sweet spot: it covers a typical monthly bill of ₹3,000–₹5,000 and captures the full ₹78,000.

Who is eligible

The process, step by step

  1. 1
    Register on the national portal You register with your electricity connection number and mobile number, then submit an application for the system size you want.
  2. 2
    Wait for technical feasibility approval TANGEDCO checks whether your connection and local transformer can support the system. This is usually the step that takes the longest.
  3. 3
    Installation Once approved, the system is installed. A straightforward residential rooftop job typically takes two to four days on site.
  4. 4
    Inspection and net meter installation TANGEDCO inspects the installation and fits the bi-directional meter, then issues the commissioning certificate.
  5. 5
    Submit bank details and receive the subsidy After commissioning, you upload your bank details and a cancelled cheque on the portal. The subsidy is credited directly by the central government.

A note on timelines: the subsidy arrives after commissioning, not before. You pay the full system cost upfront and are reimbursed. Plan your budget around the gross cost, and treat the subsidy as money that comes back to you afterwards.

Common mistakes

The two we see most often: starting installation before feasibility approval comes through, which can invalidate the claim, and using equipment that is not on the approved list to save a little money upfront. Both are avoidable, and both cost far more than they save.

We handle the portal registration, paperwork, and TANGEDCO follow-ups for every residential customer. Talk to us about your roof →

Subsidy

Tamil Nadu's new ₹22,000 top-up: up to ₹1 lakh combined with the central subsidy

Tamil Nadu has announced its own rooftop solar incentive on top of the central PM Surya Ghar subsidy — the first time in years the state has added money to the central scheme rather than running a separate, smaller one of its own.

What was announced

In the Tamil Nadu government's Revised Budget for 2026–27, presented on 5 August 2026, the state introduced a new Rooftop Solar Subsidy Scheme offering domestic consumers an additional ₹22,000, layered on top of the central PM Surya Ghar subsidy. ₹50 crore has been allocated to fund it.

For a system above 3 kW, the central scheme already provides up to ₹78,000. Add the new state top-up and an eligible household can receive up to ₹1,00,000 in combined subsidy.

Central subsidy (PM Surya Ghar, 3 kW+) ₹78,000
Tamil Nadu state top-up (new, 2026) ₹22,000
Combined benefit Up to ₹1,00,000

How to claim the Tamil Nadu top-up

The process is simple. There are only two steps, and the first one is the same installation journey you follow for the central subsidy.

  1. Complete the installation journey. Installation, inspection, net metering and commissioning.
  2. Wait for the central subsidy to be credited. Once it is, the state portal says your application data flows automatically for TEDA verification and state subsidy processing.

What we do for you: we handle the installation, inspection, net metering, commissioning and your full PM Surya Ghar application. Because your application data flows on automatically after the central subsidy is credited, you do not need to start a separate state application.

Why this matters for your decision

If you have been waiting to see whether a state incentive would appear before installing, this is that signal. Tamil Nadu joins states like Uttar Pradesh and Gujarat in stacking a state top-up onto the central scheme, and ₹50 crore has already been set aside to pay for it — this is a funded commitment, not just a statement of intent.

The state top-up is processed after the central subsidy is credited, so the sequence is straightforward: finish the installation, inspection, net metering and commissioning, and the rest follows. Your exact eligible amount depends on your system size and category, so we confirm your figure with you before installation.

We will take care of every subsidy you qualify for, central or state. Talk to us about your roof →

Net Metering

How TANGEDCO net metering works in Tamil Nadu

Net metering is what makes rooftop solar worth it. Without it, any power your panels produce while you are out of the house is simply wasted. Here is how the mechanism works in practice.

The bi-directional meter

A normal meter counts in one direction: power coming into your home. When you install solar, TANGEDCO replaces it with a bi-directional meter that counts both directions separately — units you import from the grid, and units you export to it.

Your panels feed your home first. Anything your home is not using at that moment flows out to the grid and is recorded as an export. At night, or when it is cloudy, you draw from the grid as usual and that is recorded as an import.

How your bill is calculated

At the end of the billing cycle, your exported units are set against your imported units. You are billed on the net figure — hence the name. If you exported more than you imported, the surplus is generally carried forward as a credit to the next cycle rather than paid out in cash.

A simplified example

Units imported from grid400
Units exported to grid340
Net units billed60

Note that fixed charges still apply. Net metering reduces your energy charges, but the standing charges tied to your connection remain on the bill. This is why a "zero bill" in practice usually means a very small bill rather than literally nothing.

Sizing matters more than you think

Because surplus export is credited rather than paid out generously, there is little financial sense in heavily oversizing a system beyond your actual consumption. A system matched to your usage pays back faster than an oversized one. This is the single most common thing homeowners get wrong when they are quoted purely on system size.

The approval sequence

We manage the net metering application and TANGEDCO coordination end to end. Ask us about your connection →

Commercial

Solar for factories and mills: what the numbers look like

For a textile mill or an engineering unit anywhere in Tamil Nadu, electricity is often the second or third largest line item after raw material and labour. Solar changes that line permanently. Here is how the economics work.

Why commercial payback is faster than residential

Commercial and industrial connections do not receive the PM Surya Ghar subsidy, which sounds like a disadvantage. In practice, commercial payback is often quicker for three reasons: commercial tariffs per unit are considerably higher than domestic ones, consumption happens during daylight hours when panels are generating, and businesses can claim accelerated depreciation on the asset.

Accelerated depreciation

Under the Income Tax Act, solar assets qualify for accelerated depreciation, letting a business write off a large share of the system cost in the first year rather than spreading it thinly over decades. For a profitable company, this meaningfully reduces the effective cost of the system in year one. Your auditor is the right person to confirm exactly what your business can claim, since it depends on when the asset is commissioned and on your tax position.

Daytime load is the key variable

Solar generates between roughly 6am and 6pm. The closer your operations match that window, the better the return. A spinning mill running two day shifts, a cold storage facility with compressors running through the afternoon, or an office with heavy air-conditioning load are all near-ideal. A unit that runs mainly at night will see a weaker case unless it goes down the open access route.

Three ways to fund it

CAPEX — you own the system You pay for the system and own the asset. Highest long-term saving, and you claim the depreciation benefit. Best if you have the capital available and plan to stay in the premises.
OPEX / RESCO — developer owns the system A developer funds and maintains the system on your roof and you simply buy the power generated at a fixed discounted rate. No upfront investment, lower savings than CAPEX, and maintenance is not your problem.
Open access — buy power from off-site For high-tension consumers whose roof is too small for their load. You buy solar power generated at a remote park and wheeled to you through the grid. Relevant above roughly 100 kW of sanctioned load.

What to check before you commit

We start every commercial enquiry with a free audit of your last twelve months of bills and a site survey. Request a commercial assessment →